Gibson Flying V – 3rd update

Now that the glue has dried I can refit the pickups to drill the new holes.  I’ve used cotton in place of the E-strings to make sure the location is right.

SANYO DIGITAL CAMERA

Holes drilled and pickups installed.  I’ve left a slight gap between the bridge pickup and the pickguard otherwise the hole for pickup would be visible on the other side.

SANYO DIGITAL CAMERA

The next step will be to re-wire the electronics.

To see the job in full click here.

Leave a Reply

Your email address will not be published. Required fields are marked *